Can I send a rough requirement before final drawings are ready?
Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.
Share your drawing, target magnetic performance, application environment, quantity plan, and destination. We will respond with practical engineering and sourcing support.
Inquiry Email
Include target torque/speed, quantity, and delivery location.
RFQ Form
Use the form for quick routing, or email directly when drawings, attachments, or CC recipients are required.
| Required Item | Example | Why It Helps |
|---|---|---|
| Target product type | Magnet, magnetic assembly, rotor, coupling, holder, or sensor part | Quickly routes the inquiry to the right engineering path. |
| Material and magnetic target | NdFeB N42SH, SmCo 2:17, ferrite, pull force, flux, or gauss | Prevents grade, temperature, and performance mismatch. |
| Drawing and assembly interface | Geometry, tolerance, coating, magnetization, housing, or adhesive | Avoids sample mismatch and assembly rework. |
| Quantity plan | Prototype qty + annual forecast | Improves lead-time and pricing accuracy. |
| Destination and terms | Country, Incoterm, requested ship date | Aligns packaging, documents, and shipping plan early. |
Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.
Use a revision-controlled change request with effective lot and impact scope agreed by both teams.
Yes. Please list required document types in the RFQ stage so they are included in validation and delivery planning.
If your team needs a fast start, use this structure in the first email. It improves quote precision and reduces clarification cycles.
| Output | Purpose | Buyer Action |
|---|---|---|
| Material and architecture direction | Narrow viable material grades, magnetic layout, coating, and assembly interface assumptions. | Confirm baseline sourcing path before cost-detail discussion. |
| RFQ clarification list | Close data gaps that affect pricing and lead-time accuracy. | Return missing values and drawing references in one reply. |
| Validation recommendation | Define sample test scope and acceptance evidence for technical sign-off. | Align internal engineering and procurement gates before PO. |